panels three panels in the next release to be placed in the path THE CHESTNUT OAK
Three panels, which will be placed along the route approximately every 2.2 km, are being design and construction at a local print shop.
The folders contain information on the flora and fauna of the site and a map where it is reported the way forward.
The Municipality of Jesi has taken steps to finance the cost of the signs.
Though most of the materials needed for the implementation of the panels are already available to the municipality, they will be completed by 16/04/2010, the date of opening of the route with a marathon class.
0 comments:
Post a Comment